Pre-Upgrade Checklist
Checklist discipline. Every item is meant to be answered yes / no with evidence. Items marked critical are non-negotiable; items marked warn are judgement calls; items marked info are baseline expectations.
Items
- Release notes read for both VyOS and FRR (severity: critical)
- Compatibility verified for all peers and downstreams (severity: critical)
- Backup of current configuration taken off-router (severity: critical)
- Rollback path documented (previous image available) (severity: critical)
- Out-of-band access tested (severity: critical)
- Canary router upgraded first and validated (severity: warn)
- Upgrade window scheduled during low traffic (severity: info)
- Stakeholders notified (severity: info)
- Maintenance mode / drain procedure ready (severity: info)
- Upgrade runbook reviewed and understood (severity: info)
Severity legend
- info: baseline expectation
- warn: judgement call; production-grade depends on context
- critical: non-negotiable; a missed critical item is a release blocker
Evidence retention
The completed checklist is evidence for the change ticket, the audit, and the post-incident review. Store it where it can be recovered if the router is lost.