Pre-Change Checklist
Checklist discipline. Every item is meant to be answered yes / no with evidence. Items marked critical are non-negotiable; items marked warn are judgement calls; items marked info are baseline expectations.
Items
- Change ticket open, change owner identified, change window current (severity: critical)
- Change is peer-reviewed (severity: critical)
- Blast radius identified and confirmed acceptable (severity: critical)
- Out-of-band access (console / serial / IPMI) tested (severity: critical)
- Pre-change state captured (configuration + operational) (severity: critical)
- Rollback plan documented and tested where possible (severity: critical)
- Stakeholders notified (severity: warn)
- Maintenance window / change window scheduled (severity: info)
- Backup of current configuration taken off-router (severity: critical)
- Validation commands pre-defined (severity: info)
- Communication channel open (war-room / chat / ticket) (severity: warn)
Severity legend
- info: baseline expectation
- warn: judgement call; production-grade depends on context
- critical: non-negotiable; a missed critical item is a release blocker
Evidence retention
The completed checklist is evidence for the change ticket, the audit, and the post-incident review. Store it where it can be recovered if the router is lost.