Quarterlyvyos-backup-dr

Backup and DR Readiness Checklist

10 items ·4 critical ·3 warn ·3 info

Backup and DR Readiness Checklist

Checklist discipline. Every item is meant to be answered yes / no with evidence. Items marked critical are non-negotiable; items marked warn are judgement calls; items marked info are baseline expectations.

Items

  • Configuration saved with ‘save’ (severity: critical)
  • Configuration pushed to remote backup (encrypted, offsite) (severity: critical)
  • Configuration includes all routing-protocol credentials (severity: critical)
  • Restore tested on a scratch router (severity: warn)
  • Restore tested on different hardware (interface mapping) (severity: warn)
  • Restore tested with different VyOS version (rollback) (severity: warn)
  • VPN keys / certificates backed up separately and securely (severity: critical)
  • DR runbook current and tested (severity: info)
  • DR exercise scheduled quarterly (severity: info)
  • RPO and RTO documented for the routing estate (severity: info)

Severity legend

  • info: baseline expectation
  • warn: judgement call; production-grade depends on context
  • critical: non-negotiable; a missed critical item is a release blocker

Evidence retention

The completed checklist is evidence for the change ticket, the audit, and the post-incident review. Store it where it can be recovered if the router is lost.